Green ITADUK IT recycling directory
Blog

Digital waste tracking: what it means when you get rid of IT

Since 1 October 2026, waste sites in England and Wales must report every load they receive to a new government service. Here is who has to do what, and when, and what it changes for a business clearing out old IT.

Barge loaded with grey waste containers moored at a riverside waste transfer station beside a railway bridge
Waste containers on a Thames barge at a waste transfer station by Cannon Street railway bridge, London, 2013 · Photo: John M, CC BY-SA 2.0

For years, the paper trail for business waste has been a mix of waste transfer notes, spreadsheets and filing cabinets. The government is replacing that with a single online record of where waste goes, called digital waste tracking. The first part became compulsory this autumn, and the next part follows in 2027.

If your organisation sends old computers, servers or phones to an ITAD or IT recycling company, most of the new work falls on them rather than you, for now. But it is worth knowing what is changing, because it affects the questions you can ask and the paperwork you can expect back.

What digital waste tracking is

GOV.UK describes it as a service to "transform existing outdated systems for recording waste movements". Instead of each business keeping its own records, the people who move and receive waste enter the details into one national service. Companies can send the data from their own software through a connection to the service, or use a spreadsheet upload that GOV.UK calls temporary.

It is being built in phases, starting with the places that receive waste.

Phase 1: sites that receive waste (now)

From 1 October 2026, permitted or licensed sites that receive waste in England and Wales must report "details of every load they receive" through the "Report receipt of waste" service. That includes the treatment sites where IT equipment is taken apart, shredded or recycled.

GOV.UK's timeline says the requirement starts in Northern Ireland and Scotland in January 2027. There are some exceptions — for example, household waste recycling centres in Wales, and household waste received from residents at a recycling centre in England, don't need to be reported in this phase.

GOV.UK puts the number of waste site operators affected by phase 1 at about 12,000.

Phase 2: collectors, from October 2027

The second phase covers waste carriers, brokers and dealers — the businesses that collect and arrange the movement of waste. GOV.UK's timeline shows a private test from autumn 2026, a public test open to all waste collectors in spring 2027, and the service becoming mandatory for them from October 2027. GOV.UK estimates around 300,000 registered operators fall into this group.

Holders of waste exemptions (such as the T11 exemption many refurbishers use) are due to join in a later phase, with no date given yet.

What about the business throwing the IT away?

GOV.UK's pages don't give a date for waste producers — the offices, schools and companies that generate the waste. Until that changes, your existing duty of care stays exactly as it is. The waste duty of care code of practice says you must:

  • check that whoever takes your waste is authorised — for most collectors, that means looking them up on the public register of waste carriers
  • describe the waste accurately and pass on a waste transfer note (or a consignment note for hazardous waste)
  • keep waste transfer notes for 2 years and hazardous waste consignment notes for 3 years

The code is blunt that failing to meet the duty of care "is a criminal offence and could lead to prosecution". Our guide to duty of care and waste transfer notes explains each step.

What it changes in practice

For most organisations, very little day to day. But a few things are worth doing over the next year:

  1. Ask your provider about it. A company that runs a treatment site in England or Wales should already be reporting loads it receives. A collector should be preparing for October 2027. It's a fair question to ask how they are getting ready.
  2. Keep doing the basics. Check the carrier registration before every collection, and file your transfer notes. The new service doesn't remove those duties.
  3. Keep your descriptions accurate. Digital records only help if what goes in is right. Describe loads clearly — for example, "laptops and desktop PCs, some with batteries" rather than "IT waste".
  4. Watch for updates. The dates have moved several times; GOV.UK's own change log shows earlier targets in April 2025 and April 2026 before the October 2026 start. Check the GOV.UK pages before relying on any date.

Where to check a company's registrations

Digital waste tracking doesn't replace the public registers. Every listing on Green ITAD shows a company's waste carrier registration, exemptions and permits as either verified on the register or as the company states them, with the date we checked.

If you're choosing a provider for a clear-out, our checklist for choosing an ITAD provider covers the paperwork to ask for, and what ITAD is explains the services.

Sources

  1. GOV.UK: Digital waste tracking service (policy paper, updated 1 October 2026)
  2. GOV.UK: Mandatory digital waste tracking (updated 1 October 2026)
  3. GOV.UK: Digital waste tracking — check if you need to report the waste you receive (updated 19 October 2026)
  4. GOV.UK: Waste duty of care code of practice

Checked 22 November 2026.

This article is general information, not legal advice. Rules differ between England, Wales, Scotland and Northern Ireland — check with the regulator or an adviser for your situation.